The proposed project will enhance mobility with the addition of a separated two-way bicycle track on the south side of Burns Road for east and west-bound use. The total length of the cycle track is approximately 0.841 miles. This project was funded through an FDOT administered grant.
Proposed improvements
Installation of a divided two-way bicycle track
Installation of a raised traffic separator with reflective channelization devices
Installation of new regulatory signs and painted high-visibility bike lanes
Modified roadway cross-section with new landscaping
Construction information
Construction Start Date: March 2025
Anticipated Completion Date: October 2025
Construction Cost Estimate: $1,358,400.00
Contact information
Giles Rhoads, P.E. – Operations Director of Engineering 10500 North Military Trail Palm Beach Gardens, FL 33410 Phone: (561) 804-7013 E-mail: grhoads@pbgfl.com