Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.

Engineering

8
  • The next step would be to apply for either an Infrastructure or a Miscellaneous Engineering Permit, whichever is applicable, through the Building Department and submit engineering drawings for the city’s Engineering Department’s review and approval. In addition to engineering related items, the permit drawings will be required to match the layout of the latest approved site plan. A separate application for the Infrastructure and/or Miscellaneous Engineering Permit and a permit fee shall apply. Please refer to the
    Engineering
  • For detailed petition and permit charges please refer to the
    Engineering
  • For more details please refer to the City's
    Engineering
  • Yes. However, there is a minimum flat fee that must be paid before the engineering review can be done for a project which the site plan is not yet approved. In addition to the flat fee, hourly rates for the engineering review still apply. For more details please contact the Engineering Department or refer to the
    Engineering
  • Engineering inspections can be scheduled through the building department inspections hotline 561-799-4201 from 8 a.m. - 5 p.m. Choose the inspections selection to speak to one of our permit counter representatives. Inspections may also be scheduled personally at the City Hall Building Department from 8 a.m. - 4:30 p.m. Additionally, inspections can be scheduled 24 hours through our
    Engineering
  • A right-of-way permit shall be obtained whenever any type of work is proposed within a city’s right-of-way. Proposed work on a right-of-way includes, but is not limited to, landscape removal or installation, excavation, irrigation system removal or installation, sidewalk or curb construction, driveway aprons and other types of work not mentioned herein, however located on the right-of-way. Permits shall also be required when there is vehicular and/or pedestrian impact to a city’s right-of-way due to a specific project. Failure to obtain a right-of-way permit prior to work being done will result in a Stop Work Order. Right-of-way permits shall be obtained through the Building Department.
    Engineering
  • To obtain as-builts or any type of records from the city, a person may fill out a Request for Public Records Information Form which can be found at the Building Department lobby or through the Online Public Records Request located on the Building Department homepage. Please contact the Building Department for additional information.
    Engineering
  • Feel free to call our Planning and Zoning Department at 561-799-4230 or the Building Department at 561-799-4201 and they will transfer you to the most appropriate person.
    Engineering
Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow